1243535
CLARITY DESIGN, INC. — FEI 3011883032
Inspection Details
- Classification
- Voluntary Action Indicated (VAI) (VAI)
- End Date
- July 10, 2024
- Fiscal Year
- 2024
- Product Type
- Devices
- Project Area
- Compliance: Devices
- Location
- Poway, CA (United States)
Citations
| ID | CFR | Description |
| 3130 | 21 CFR 820.100(a) | Lack of or inadequate procedures |
| 3224 | 21 CFR 820.70(g)(2) | Periodic equipment inspection lack of or inadequate procedu |
| 3680 | 21 CFR 820.70(a) | Process control procedures, Lack of or inadequate procedures |
| 539 | 21 CFR 820.70(b) | Production and Process Change Procedures, lack of or Inad. |