FDA Inspection 832570 — Nalge Nunc International Corporation
The FDA completed an inspection of Nalge Nunc International Corporation on May 7, 2013 in Rochester, NY. The inspection was classified VAI (Voluntary Action Indicated — objectionable conditions were found but do not meet the threshold for regulatory action). 13 citations were issued during this inspection. Product area: Devices.
Inspection Details
- Classification
- Voluntary Action Indicated (VAI)
- End Date
- May 7, 2013
- Fiscal Year
- 2013
- Product Type
- Devices
- Project Area
- Compliance: Devices
- Location
- Rochester, NY (United States)
Citations
| ID | CFR | Description |
|---|---|---|
| 14714 | 21 CFR 820.30(c) | Design input - Lack of or inadequate procedures |
| 2327 | 21 CFR 820.22 | Quality audits - Lack of or inadequate procedures |
| 2430 | 21 CFR 820.30(b) | Design plans - Lack of or inadequate |
| 2604 | 21 CFR 820.30(e) | Design review - Lack of or inadequate procedures |
| 2650 | 21 CFR 820.30(f) | Design verification - Lack of or inadequate procedures |
| 3101 | 21 CFR 820.30(g) | Design validation- Lack of or inadequate procedures |
| 3117 | 21 CFR 820.70(i) | Software validation for automated processes |
| 3123 | 21 CFR 820.80(c) | Lack of or inadequate In-process acceptance procedures |
| 3128 | 21 CFR 820.90(a) | Nonconforming product control |
| 3130 | 21 CFR 820.100(a) | Lack of or inadequate procedures |
| 3263 | 21 CFR 820.250(b) | Sampling plans |
| 479 | 21 CFR 820.50 | Purchasing controls, Lack of or inadequate procedures |
| 486 | 21 CFR 820.50(a) | Evaluation of suppliers, contractors, etc., requirements |