FDA Warning Letter — Urban Electric Power
The FDA took a Warning Letter action against Urban Electric Power on Dec 27, 2022 (Pearl River, NY). The action was issued by CDER and concerns drugs products.
Action details
- Facility
- Urban Electric Power
- Date
- Dec 27, 2022
- Fiscal Year
- 2023
- Product Type
- Drugs
- Center
- CDER
- Location
- Pearl River, NY (United States)
Need the full FDA record for Urban Electric Power? Ask Claude with the RegDataLab connector and get every site's inspections, Form 483s, warning letters, recalls and import alerts, each with a link to the FDA source. Free to start, no card.
Question to ask in Claude
Use RegDataLab to give me an FDA risk summary for Urban Electric Power: recent inspections and their outcomes, warning letters, recalls and import alerts by site, with source links and dates.