1136506
MakingCosmetics Inc — FEI 3007162174
Inspection Details
- Classification
- Voluntary Action Indicated (VAI) (VAI)
- End Date
- March 5, 2021
- Fiscal Year
- 2021
- Product Type
- Drugs
- Project Area
- Drug Quality Assurance
- Location
- Redmond, WA (United States)
Citations
| ID | CFR | Description |
| 1914 | 21 CFR 211.166(a) | Lack of written stability program |
| 2012 | 21 CFR 211.188(b) | Batch production and Batch Control Record Requirements |
| 3585 | 21 CFR 211.110(a) | Control procedures to monitor and validate performance |
| 4303 | 21 CFR 211.67(b) | Written procedures fail to include |