1144199
Inspection Details
- Classification
- Official Action Indicated (OAI) (OAI)
- End Date
- June 18, 2021
- Fiscal Year
- 2021
- Product Type
- Drugs
- Project Area
- Drug Quality Assurance
- Location
- Ringwood, NJ (United States)
Citations
| ID | CFR | Description |
|---|---|---|
| 1105 | 21 CFR 211.22(d) | Procedures not in writing, fully followed |
| 1112 | 21 CFR 211.25(a) | Training--operations, GMPs, written procedures |
| 1361 | 21 CFR 211.100(a) | Absence of Written Procedures |
| 1396 | 21 CFR 211.42(c)(2) | Rejected Material Area |
| 1802 | 21 CFR 211.84(b) | Representative Samples |
| 1809 | 21 CFR 211.160(a) | Following/documenting laboratory controls |
| 3603 | 21 CFR 211.160(b) | Scientifically sound laboratory controls |