1280179
Diasol, Inc — FEI 3007137482
Inspection Details
- Classification
- Official Action Indicated (OAI) (OAI)
- End Date
- August 19, 2025
- Fiscal Year
- 2025
- Product Type
- Devices
- Project Area
- Postmarket Assurance: Devices
- Location
- Phoenix, AZ (United States)
Citations
| ID | CFR | Description |
| 14713 | 21 CFR 820.198(a) | Lack of or inadequate complaint procedures |
| 14722 | 21 CFR 820.40 | Procedures not adequately established or maintained |
| 22795 | 21 CFR 801.20(a) | Label to bear a unique device identifier |
| 2650 | 21 CFR 820.30(f) | Design verification - Lack of or inadequate procedures |
| 3103 | 21 CFR 820.30(i) | Design changes - Lack of or Inadequate Procedures |
| 3104 | 21 CFR 820.30(j) | Design history file |
| 3111 | 21 CFR 820.70(f) | Buildings |
| 3113 | 21 CFR 820.70(g) | Equipment design and installation |
| 3125 | 21 CFR 820.80(d) | Lack of or inadequate final acceptance procedures |
| 3130 | 21 CFR 820.100(a) | Lack of or inadequate procedures |
| 3282 | 21 CFR 820.90(a) | Nonconforming product, Lack of or inadequate procedures |
| 3331 | 21 CFR 820.181 | DMR - not or inadequately maintained |
| 3678 | 21 CFR 820.30(g) | Design Validation - Risk analysis not performed/inadequate |
| 3680 | 21 CFR 820.70(a) | Process control procedures, Lack of or inadequate procedures |
| 486 | 21 CFR 820.50(a) | Evaluation of suppliers, contractors, etc., requirements |
| 546 | 21 CFR 820.75(a) | Lack of or inadequate process validation |
| 633 | 21 CFR 803.17(a)(3) | Lack of System for Timely Submission of Reports |
| 732 | 21 CFR 803.50(a)(2) | Individual Report of Malfunction |