823613
Pascal Company Inc — FEI 3011632
Inspection Details
- Classification
- No Action Indicated (NAI) (NAI)
- End Date
- February 25, 2013
- Fiscal Year
- 2013
- Product Type
- Devices
- Project Area
- Postmarket Assurance: Devices
- Location
- Bellevue, WA (United States)
Citations
| ID | CFR | Description |
| 1086 | 21 CFR 211.22(b) | Adequate lab facilities not available |
| 1105 | 21 CFR 211.22(d) | Procedures not in writing, fully followed |
| 1213 | 21 CFR 211.67(a) | Cleaning / Sanitizing / Maintenance |
| 1358 | 21 CFR 211.100(b) | SOPs not followed / documented |
| 1450 | 21 CFR 211.113(a) | Procedures for non-sterile drug products |
| 14713 | 21 CFR 820.198(a) | Lack of or inadequate complaint procedures |
| 1810 | 21 CFR 211.160(a) | Lab controls established, including changes |
| 1920 | 21 CFR 211.166(a)(3) | Valid stability test methods |
| 2557 | 21 CFR 820.30(c) | Design input - documentation |
| 3101 | 21 CFR 820.30(g) | Design validation- Lack of or inadequate procedures |
| 3172 | 21 CFR 820.198(c) | Investigation of device failures |
| 3263 | 21 CFR 820.250(b) | Sampling plans |
| 3286 | 21 CFR 820.90(b)(1) | Procedures for product review,disposition lack of/inadequate |
| 3603 | 21 CFR 211.160(b) | Scientifically sound laboratory controls |
| 3680 | 21 CFR 820.70(a) | Process control procedures, Lack of or inadequate procedures |
| 3696 | 21 CFR 820.100(b) | Documentation |
| 4070 | 21 CFR 820.30(g) | Design validation - documentation |
| 486 | 21 CFR 820.50(a) | Evaluation of suppliers, contractors, etc., requirements |
| 546 | 21 CFR 820.75(a) | Lack of or inadequate process validation |